Over a dozen lab, clean room and manufacturing projects were completed for Applied Materials.
- Building 2 and 3 involved numerous metrology and process tools installations.
- Building 2 included design services for the construction of a Class 1000 clean room lab with strict controls to optimize capabilities of the precision metrology tools.
- Building 5 – The entire building was seismically upgraded by installing steel beams to strengthen failing wood members. Existing clean rooms and H-6 labs were maintained in operation with little downtime.