Healthcare Lab Improvements Building 28 and 64

Bayer

Healthcare Lab Improvements Building 28 and 64

  • Process cooling system to maintain close temperature in the media
  • Primary and redundant process cooling system for 12 plasma sterilization stations on B28 Research Lab
  • Process control stainless steel enclosures for each station to monitor chilled water flow, pressure and temperature.
  • Chilled water temperature had to be maintained within ±1°C

Industry:

Biotech

Location:

Berkeley, CA

Services:

Architectural Design Lead, MEP Engineering, Construction